Discussion and collaboration with the employer (Mina Glass Company) and the Industrial Consultant (CMP Company) to determine the common border between the services of the German and Iranian consultants (the company) and determine the design principles. The design of the first and second stages of the production line and its related buildings in the industrial city of Alborz (Qazvin) with an area of 14,000 square meters, including hot end, cold end, batch plant, workshop, office building, reservoirs and channels Facilities, landscaping and other sub-works related to the main work include the calculation and design of industrial foundations and structures of all production halls and related buildings, the provision of all architectural plans, the compilation and preparation of all plans of mechanical and electrical installations General High supervision over executive operations